BELLINGHAM COGENERATION FACILITY
OperatingNatural Gas power plant
- Capacity
- 386 MW
- Primary fuel
- Natural Gas
- County
- Norfolk County
- Operator
- NORTHEAST ENERGY ASSOCIATES LP
- Status
- Operating
- Commissioned
- 1991
- EIA plant ID
- 10307
- Generators
- 3
- Technology
- Natural Gas Fired Combined Cycle
- Net generation (2024)
- 368 GWh
- Capacity factor (2024, EIA nameplate)
- 11%
- Data vintage
- EIA-860 2024 final; EIA-923 2022-2024 final
- Coordinates
- 42.0925, -71.4833
BELLINGHAM COGENERATION FACILITY, a 386 MW Natural Gas power plant in Norfolk County, Massachusetts.
How BELLINGHAM COGENERATION FACILITY compares
With 386 MW of capacity, BELLINGHAM COGENERATION FACILITY ranks 8th among the 125 operating power plants Bywatts maps in Massachusetts and 5th of the 22 operating Natural Gas plants in the state. It accounts for about 7.2% of Massachusetts's operating Natural Gas capacity and 4.2% of all operating capacity in the state. Nationally it is the 385th-largest of the 1,185 operating Natural Gas plants in the database. Commissioned in 1991, it is older than 54% of the 122 operating Massachusetts plants with a recorded commissioning year. It shares Norfolk County with 8 other operating plants, including FORE RIVER GENERATING STATION and ANP BELLINGHAM ENERGY PROJECT.
EIA-860 lists 3 generators at the site with 386 MW of nameplate capacity, all natural gas fired combined cycle technology. Net generation was 368 GWh in 2024 (an 11% capacity factor), up 74% from 2022.
Grid neighborhood
The closest transmission line found within 10 miles is a 345 kV line, under 0.1 miles away. Another 26 operating power plants totaling 3,408 MW sit within 25 miles; the largest is ENTERGY RHODE ISLAND STATE ENERGY LP (596 MW, Natural Gas). Within 50 miles are 4 mapped data centers; the nearest is Equinix BO1 - Boston, Waltham in Waltham, about 23.6 miles away.
Computed by Bywatts from HIFLD power plant and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology
Weather peril exposure
BELLINGHAM COGENERATION FACILITY is a 386 MW natural gas power plant in Norfolk County, MA, operated by NORTHEAST ENERGY ASSOCIATES LP, commissioned in 1991. Norfolk County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.4 of 5 at the 10th national percentile. Hurricane is the leading peril, rated Relatively Moderate by FEMA at the 77th percentile.
The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a natural gas plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.
Norfolk County hazard ratings
| Peril | FEMA rating | National percentile | Peril score | Events per year |
|---|---|---|---|---|
| Hurricane | Relatively Moderate | 77th | 4.1 of 5 | 0.18 |
| Coastal flooding | Relatively High | 75th | 4.0 of 5 | 7.9 |
| Earthquake | Relatively Moderate | 64th | 3.6 of 5 | <0.01 |
| Ice storm | Relatively High | 50th | 3.0 of 5 | 1.8 |
| Lightning | Relatively High | 33rd | 2.3 of 5 | 21.0 |
| Wildfire | Very Low | 25th | 2.0 of 5 | <0.01 |
| Riverine flooding | Relatively High | 22nd | 1.9 of 5 | 2.9 |
| Tornado | Relatively Moderate | 18th | 1.7 of 5 | 0.08 |
| Winter weather | Relatively Low | 14th | 1.6 of 5 | 13.0 |
| Strong wind | Relatively Moderate | 13th | 1.5 of 5 | 0.92 |
| Heat wave | Relatively Moderate | 7th | 1.3 of 5 | 6.1 |
| Hail | Very Low | 3rd | 1.1 of 5 | 1.8 |
Model hail, wind and flood exposure for Norfolk County in the weather risk calculator
Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.
Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.