ELM ROAD GENERATING STATION

Operating

Coal power plant

Capacity
1,403 MW
Primary fuel
Coal
County
Milwaukee County
Operator
WISCONSIN ELECTRIC POWER CO
Status
Operating
Commissioned
2010
EIA plant ID
56068
Generators
2
Technology
Conventional Steam Coal
Net generation (2024)
7,553 GWh
Capacity factor (2024, EIA nameplate)
61%
Data vintage
EIA-860 2024 final; EIA-923 2022-2024 final
Coordinates
42.8500, -87.8332

See it on the map

ELM ROAD GENERATING STATION, a 1,403 MW Coal power plant in Milwaukee County, Wisconsin. Operated by WISCONSIN ELECTRIC POWER CO, commissioned 2010.

How ELM ROAD GENERATING STATION compares

With 1,403 MW of capacity, ELM ROAD GENERATING STATION is the largest of the 141 operating power plants Bywatts maps in Wisconsin and the largest of the 15 operating Coal plants in the state. It accounts for about 21% of Wisconsin's operating Coal capacity and 8.7% of all operating capacity in the state. Nationally it is the 78th-largest of the 324 operating Coal plants in the database. Commissioned in 2010, it is newer than 92% of the 141 operating Wisconsin plants with a recorded commissioning year. Its operator, WISCONSIN ELECTRIC POWER CO, runs 13 operating plants in Wisconsin totaling 5,238 MW. It shares Milwaukee County with 5 other operating plants, including SOUTH OAK CREEK and VALLEY.

EIA-860 lists 2 generators at the site with 1,403 MW of nameplate capacity, all conventional steam coal technology. Net generation was 7,553 GWh in 2024 (a 61% capacity factor), up 27% from 2022. Its generators came online between 2010 and 2011.

Grid neighborhood

The nearest named substation is ST. RITA (138 kV), about 4.9 miles away; the closest transmission line found within 10 miles is a 345 kV line, under 0.1 miles away. Another 7 operating power plants totaling 1,954 MW sit within 25 miles; the largest is SOUTH OAK CREEK (1,240 MW, Coal). Within 50 miles is one mapped data center, 324 E Wisconsin in Milwaukee, about 13.6 miles away.

Computed by Bywatts from HIFLD power plant, substation and transmission line records, EIA-860/923 survey data and PeeringDB data center locations; distances are straight-line. Sources and methodology

Weather peril exposure

ELM ROAD GENERATING STATION is a 1,403 MW coal power plant in Milwaukee County, WI, operated by WISCONSIN ELECTRIC POWER CO, commissioned in 2010. Milwaukee County carries low modeled catastrophe exposure in the FEMA National Risk Index, scoring 1.5 of 5 at the 12th national percentile. Winter weather is the leading peril, rated Very High by FEMA at the 42nd percentile.

The Bywatts loss layer is calibrated to solar PV hardware, so it is not applied to a coal plant. The ratings below are the FEMA National Risk Index county hazard ratings for this location.

1.5 of 5Modeled catastrophe exposure
LowExposure band
Winter weatherLeading peril
Relatively HighFEMA county risk rating

Milwaukee County hazard ratings

PerilFEMA ratingNational percentilePeril scoreEvents per year
Winter weatherVery High42nd2.7 of 515.8
TornadoVery High42nd2.7 of 50.40
Heat waveRelatively High40th2.6 of 53.1
Riverine floodingRelatively High28th2.1 of 52.1
HailRelatively Moderate27th2.1 of 52.7
Ice stormRelatively Moderate25th2.0 of 50.47
LightningRelatively Moderate25th2.0 of 533.7
EarthquakeRelatively Low24th2.0 of 5<0.01
Strong windRelatively High23rd1.9 of 53.1
WildfireVery Low8th1.3 of 5<0.01
Coastal floodingVery Low7th1.3 of 50.01
HurricaneVery Low0th1.0 of 5<0.01

Model hail, wind and flood exposure for Milwaukee County in the weather risk calculator

Ratings are the FEMA National Risk Index county hazard ratings; the peril score is a Bywatts transform of the FEMA national percentile. Full data sources and the solar vulnerability methodology are in the weather risk calculator.

Modeled estimate for screening and negotiation. Built from FEMA National Risk Index county hazard data and a solar vulnerability layer documented above. Not a quote, a binder, or actuarial advice, and not a substitute for a carrier's own model. Hazard data: FEMA National Risk Index December 2025, synced 2026-07-24. Resolution is county level, not site level.